How an exhibition
stand is built
seven stages, from brief to dismantling
VØID builds a stand in seven stages, from brief to dismantling. Each stage has an output the client approves before moving on to the next.
-
Brief
Goal of the show, products on display, target audience, floor plan of the space and budget. Every following stage starts from here.
-
Analysis of the space and regulations
The show’s technical regulations, maximum heights, safety constraints and the stand’s position in relation to visitor flows in the hall.
-
Concept
Layout, visitor route, materials and technology. The concept is presented with 3D renders and a moodboard and revised until approved.
-
Detailed design
Technical drawings, electrical system, lighting and structural calculations: the design that production and installation work from.
-
Permits
Submission of the project to the exhibition organiser, material certifications and safety documents for the build-up.
-
Production and content
Building the structures, printing the graphics, video for LED walls and programming the installations. Content and structures come from the same design, so formats and dimensions match.
-
Installation, show, dismantling
Build-up on the days set by the show, technical support throughout the event, dismantling and removal of materials.
How we work
[who runs the project]
A project manager is the client’s single point of contact for every stage, working with an architect, designers, graphic designers, video makers and a site manager. For companies exhibiting at several shows, the stand can be designed in reconfigurable modules, as for Schuberth across three European shows.
[what we need from the client]
Floor plan of the space, the show’s regulations, logo and brand materials, product list, commercial goals.
[how much it costs]
The quote is prepared per project, after the brief and the floor plan: here is what determines the cost of a stand.